Roadway Resurfacing

DARTMOUTH ROAD

(From Hillcrest to Lake Drive)

Please be advised on Thursday, April 13th, resurfacing of the above referenced road will begin.  This project involves the milling and the application of a new asphalt surface.

During the first stage of this project, a milling crew will work until the road has been milled.  This portion takes place quickly and the disruption of road access is usually minimal.  Once the milling is complete, the road surface will be rough and travel should be done with caution.

The second stage of the project is the installation of the new asphalt surface.  The paving crew places and rolls the new asphalt, cooling time is needed for the material to cure.  During this time, the road will be closed to traffic.

Weather permitting, the entire project should be completed within one day.