Mountain Lakes Green Team Meeting Minutes
March 3, 2010
Attendance: N. Wright, M. Rosseland, D. Fewell and J. Bay
Team members updated others
on the progress made against key areas of the Sustainable Jersey program. The
next step for many is uploading documentation. I checked out the process and
found a piece entitled "Getting Started Guide" on the left hand side of the
home page of sustainablejersey.com. Whoever logs in first has the honor of choosing
our permanent password! Evidently, we submit and submit and it retains the
information until we are ready to submit the entire dossier. At that time we
are “locked out” and await the final word on certification.
Meeting schedule: March 24, April 21, May 19 and June 16. All
meetings begin at 3:15pm and are held in the conference room at Borough Hall.
Member Update:
Nicole Wright Priorities: 30 pts (assuming audit funding not cut; no
Forestry Plan)
- Municipal Carbon
Footprint: 10 points
- Complete site spreadsheet
with scope 1 and 2 emissions
- Status: Will have
completed by next meeting
- Municipal Energy Audit: One bldg = 20 pts; All Bldgs owned and
operated by municipality = 50 pts
- For BPU audits, submit
the energy performance summary report from a BPU energy services company,
or a statement of energy performance from the EPA Energy Star Portfolio
Manager program. For non-BPU audits, submit the final report, be sure
that it addresses criteria listed on the website.
- For multiple bldg
submission, be sure to submit a bldg inventory and categorize bldgs based
upon their need for outer shell repairs and their overall energy usage.
See the website.
- Status: B. Lewis to
receive the proposals from potential contractors on March 12; update the
team at next meeting. Will State funding cuts to the Clean Energy
Program kill this?
§
Community Forestry Plan &
Canopy Goal: 20 pts.
- Submit copy of the 2009
or 2010 NJDEP “Approved Status” letter documenting our community forestry
plan and that we have met CORE training requirements, completed a minimum
of 8 CEUs and completed an annual accomplishments report for 2009.
- Submit copy of our tree
canopy goal as adopted by a Shade Tree Commission or EC including meeting
dates and actions taken by the group.
- Status: Investigate if
we have such a plan; speak to Shade Tree and Woodlands to determine if
we should try to create one as it is a prerequisite to all other
woodlands programs. Funding is available for these actions.
- Tree Maintenance Plan: Must have Forestry Plan first
- Tree Hazard and Health
Assessment Inventory Projects:
Must have Forestry Plan first
Mary Rosseland Priorities:
45pts (assuming water conservation
ordinance is in)
- Pay as You Throw
Program: 10pts
- Submit description of program
including kick off date, rate structure and list of complimentary waste
reduction programs
- Submit samples of
educational outreach materials
- Estimate # tons diverted
or reduced
- Status: Ready to be
submitted with the possible exception of # tons estimate
- Establish Recycling
Depot: 10 pts
- Address, photo and hours
of operation of Depot
- List of materials
collected
- Estimate # tons of each
material recycled
- Estimate # of residents
who use it
- Status: Ready to go
with the possible exception of tonnage estimate by recyclable materials
vs. totality
§
Conduct Community Paper
Shredding Day: 5 pts
- Estimate # tons shredded
- Submit educational
outreach materials
- Water Conservation
Ordinance: Still under
development.
- Community Education: 10 pts
- Submit outreach materials
documenting the Green Café movie series
- Identify partners, costs,
areas for improvement and next steps
- Status: Mary to speak
with Marni re documenting areas of improvement and next steps
- Nicole to search files
for an historical calendar of movie listings
Dave Fewell Priorities: 10 pts (assuming we don’t have an approved
Forestry Plan)
- Education for
Sustainability Programs: 10pts
- Identify authentic
learning opportunities in schools that engage students in data collection.
- Submit a brief report
about the ongoing stream monitoring program at MLHS. Describe the
project, partners, estimated costs, assess what worked and what could be
improved, identify next steps for community outreach/education (mention
publishing NRI and presentation to Borough Council). Submit copy of any
materials used in the program.
- Tree Planting Programs: If we have a met requirements for NJDEP
Community Forestry plan.
Jackie Bay Priorities:
40 pts (assuming no Open Space Plan)
- Create Green Team: 10pts
- Submit municipal
resolution, list of team members, and demonstrate team activity
- Status: Get these
minutes and list of upcoming meeting dates to Andy Bulfer; submit info.
- Natural Resources
Inventory: 20pts
- Submit finished document
and documentation that municipality has adopted a policy to regularly
update NRI
- Status: Continue to
work on the NRI with EC members; Deadline: end of June 2010
- Environmental
Commission: 10pts
- Submit copy of ordinance
that established the commission and Annual Accomplishments Report for
2009
- Status: Print copy of
ordinance and speak to EC Chair about report when she returns 3/18
- Open Space Plan: 10pts
- Submit plan that details
municipal goals and policies, open space inventory, needs analysis,
resource assessment, action plan, public participation process, GPS maps
and documentation verifying that the Plan was incorporated into the
Master Plan.
- Work with Ellen to
determine if this is doable
POINTS: 125 Out of
needed 150
Additional Areas under
Consideration:
- Green Challenges and
Community Programs: 20 pts
- Submit documentation
showing that 2.5% of households or residents have signed a pledge
to change their behavior; submit education materials, pledge forms and
reasonable verification that target pledge rate has been achieved (w/o
submitting actual names).
- Plant Native Pledge from
Garden Club? Nicole to investigate post March 31 next meeting date
- Anti-Idling Pledge?
Mary to approach Robin Anderson to see if her class would like to take
this on with our assistance