Borough of Mountain Lakes

Lakes Management Advisory Committee Meeting

10/5/10

Present:

Chair: Susan Ferguson

Members: Bailey, Dewing, Tippy, Wexler

Borough Manager: Barry Lewis

Council Liaison: George Jackson

Allied Biological: Glenn Sullivan

Borough DPW Director: Mark Prusina

Member of the public Bill Albergo.

Meeting called to order @ 7:36 PM

Chair:

4September Meeting minutes – Accepted

4Discussion of annual walk.  Picked Saturday October 30th at 9:30 to meet at the parking lot at Borough Hall.

4Discussion of goals.  Request from Borough office for 3 goals.  Discussion of dam repair monitoring, continuing long term plans of lake cleaning, determining the proper water level for Mountain and Wildwood Lakes.

4Discussion of expiring terms and need for continuity.

4The Cove as part of the Centennial projects.  Remove invasive barberry etc.  Discussion of process.  Suggestion of emergent plants as well as the barrier plants.  Discussion of need to prevent erosion and runoff.

Borough Manager:

4Discussion of dam work.  Fiberglass spillway boards still on order.  Discussion of leak repair in Wildwood.

4 Manager discussed lowering of lake levels.  Lake level permit has been sought, approval imminent.  Notification to lake owners coming when we have permits.  Borough will make issues about lake encroachment clear.  Permitted to lower as much as two feet.

4Discussion of Canal clean-up.  Discussion of obtaining access.  DPW Director discussed issues of access, damage to access properties, disposal of spoils, all related to the Canal. 

4 DPW Director discussed other current work, provided report and pictures.  New lake level gauges are in production.  Met with inspectors from Converse.  Inspected spill ways.  Opened flap gate on cofferdam in anticipation of storms.  Cleaned out Boulevard storm water inlet on Wildwood.  Lake level is currently 2+Ó above Òhistorical lineÓ (so characterized by Wildwood Lake property ownersÕ manifesto). 

Allied Biological:

4Completed seasonal surveys.

4Treated Eurasian Milfoil in Wildwood Lake.  Takes about 10 days to show effect on plants. 

4 $5,700 to increase aeration system in Birchwood.  $1,500 for further upgrade to compressor.  Discussion of oxygen level decrease when Borough turned off existing compressor when discussing relocating system to another lake.  Clarification that the existing system would remain and capacity would approximately double.  Discussion of alum treatment and oxygen level history.

Sense of the Committee resolution that the aeration system increase be budgeted in 2011.

4Discussion of GrundenÕs Pond.  Possibility that Borough vehicles may be able to maneuver the Hydrorake into Grundens.  Discussion of cost and Canal project.  Budget issues in the hands of the Manager and Council.

New Business: 

Old Business: Discussion of selling the bathymetric maps.  Possible to print maps on demand. 

Next Meeting: November 2, 2010

Meeting adjourned @ 9:07 PM